With he Midleton well being drilled and expected to be drilled by end of August we now have a drill free beside Barryroe. It costs between 200000 and 3000000 a day to use the drill. If Barryroe were to be drilled and the correct testing done this would take perhaps 30 days. This is a cost of between 6 and 9 million. I cannot understand why Providence do not approach either Fastnet, PETRONAS, Cairn, Sequa, Drilling Rig Owner etc etc and do a deal. This is pittance for a drill. It makes no sense.