DTM Early Birds - Re: DTM Early Birds Stream Log - UKOG today announces that, as...

Live Discuss

DTM Early Birds is a custom discussion created by BuyBAO on 30 Jun 2014. You may be required to request membership in order to view this discussion.

For the DTM chaps.

View
Page

UKOG today announces that, as a result of the analysis and integration of subsurface data from the Horse Hill-1 ("HH-1") discovery well, in which it holds a net attributable interest of 14.56%, the calculated estimates of the discovered most likely gross oil initially in place ("OIIP") within the overall Upper Portland sandstone conventional reservoir in the HH-1 and Collendean Farm-1 ("CF-1") structure have increased by over 250% from the 3.1 million barrels ("mmbbls") reported on 24 October 2014, to a current most likely OIIP of 8.2 mmbbls. Similarly, calculated estimates of low case (P90) discovered OIIP has increased by nearly 400% to 5.7 mmbbls and high case (P10) OIIP volumes show a 250% increase to 12.1 mmbbls.

Page