Hurricane Energy - Re: HUR Stream Log - Production tests achieved a sustainable...

Live Discuss Polls Ratings
View
Page
10:26 04/07/2014

Production tests achieved a sustainable oil flow rate using an Electrical Submersible Pump (ESP) of 9,800 stock tank barrels of oil per day (STB/d), the established oil flow rate being constrained by the capacity of the surface test equipment.

Page