Share Discussion Forum

View
10:10 06/02/2014

KBC, it's possible I suppose re. copper, but that it certainly not going to generate the cash needed. The transportation side of things is a little puzzling, but who knows what the dynamics are in terms of peripheral commercial relationships.

09:53 06/02/2014

They could give them the go ahead on the copper only? Did you notice they are not putting a plant at Ndola (in the considered options). So are they going to allow them to transport hundreds of thousand of tons from c120miles away through Kabwe. Seems crazy. More realistically they will have to do their own DFS on the sable zinc local stock piles. That appears an option but again need more detail.

09:44 06/02/2014

Welcome to the Oil & Gas Forum

09:43 06/02/2014

Just testing a Taylor Wimpey thread.

09:38 06/02/2014

KBC, the 'go ahead' will be a long way off in my opinion, they are going to be asking for loads for information and plans (I would also be asking for some modelling evidence too). The cash situation is going to be a very difficult one for BMR to resolve, as I believe that most accept that the funding crisis can only be resolved once the full approval is signed off (despite us being told “MA has stated to me that there are many options of funding and when you have big assests everyone will want to lend you money” ). So if they have to have the money in the bank (maybe 2 years production cash?) before approval, where is it going to come from?

09:32 06/02/2014

Didn't see any DFS figures for the leachplant tailings, have they published that? I may of missed it? Will ZEMA?

09:29 06/02/2014

They may give the go ahead as they are likely under a lot of political pressure but what conditions will the put on any permission given It could be a bit of a poison chalice. Lets hope they have/can show significant financial backing, although a few "in the know" think thats not a problem.

09:18 06/02/2014

KBC, agreed 100%. It was the smallest section I've ever seen on Mining Experience ...apparently dependent on Ascot (who now have a less than certain relationship with MA)...do they think that ZEMA will be impressed with this experience when it comes to such a politically and technically challenging programme of work?

09:16 06/02/2014

They have made an open end commitment to leave the site clean, no value put on that? All this eats into the final profit figure, need more details tbh.

09:12 06/02/2014

Whats supposed to be happening with the non jorc (lower content but still significant) Leach Plant tailings (c3,000.000tons) left? c$1.25m will not be enough to lower the contained metal there to a safer level.

Page